Topsoil stripped
Organic soil removed from under the pad.

Land Clearing & Site Prep
A building pad has to be flat, firm and well drained. Stripping, filling and compacting it correctly prevents settling later.
Call or text today615-431-3789Building Pad Preparation
A slab or foundation is only as stable as the pad it sits on. Preparing a pad means stripping topsoil and organic material, cutting or filling to grade, compacting fill in lifts, testing where required and capping with crushed stone. Water is directed away from the pad on all sides.
We prepare building pads for owners and builders across Nashville and Middle Tennessee. We stake the corners, strip the area, cut and fill in compacted lifts, shape drainage, place and compact stone and coordinate testing with your engineer.
What you get
Organic soil removed from under the pad.
Placed in lifts and compacted.
A firm, free-draining surface.
Slopes and swales that shed water.
The process
We lay out corners and grades.
Soil and fill are placed and compacted.
Stone is placed and the grades are checked.
FAQ
We coordinate testing with your engineer or testing firm when required.
Crushed limestone or recycled concrete base, depending on the plan.
Yes, with cuts, fills and retaining walls where needed.
Related services
Site GradingRough and finish grading for lots, pads, drives and yards with drainage planned in.Learn more
Access Road GradingClearing, grading and stoning of gravel roads and long driveways through woods and farms.Learn more
Foundation RemovalBasement, block and poured foundation demolition, backfill and compaction.Learn more
Service areas
From Clarksville to Shelbyville and Dickson to Cookeville, pick your city to see the demolition, clearing and removal work we handle in your part of Middle Tennessee.
Not on the list? Call 615-431-3789. We take projects across Middle Tennessee.
Call, text or send the form. Tell us about the property, what needs to come down and when you hope to start, and we will take it from there.